How to Choose Press Tonnage for Your Stamping Part (63T to 500T)
A wrong tonnage calc wastes your tool. A right one ships the job. Here is the 60-second formula we use on every RFQ that names a part thickness.
The 4 inputs you need before quoting a part
Before we can recommend 110T, 250T or 500T, four numbers go on the table:
Material type and grade (mild steel behaves differently from stainless)
Blank thickness in mm (the thicker, the more force)
Perimeter of the cut + draw in mm (this is what most beginners skip)
Whether the operation is blanking, drawing or bending (force multiplies differently)
The 60-second formula
For blanking and piercing, the force equation is:
Force (N) = Perimeter (mm) × Thickness (mm) × Shear Strength (MPa)
Shear strength in MPa = N/mm², so this product gives you Newtons directly — no division needed yet.
Convert Newtons to tonnes-force: T = Force (N) ÷ 9,807. The engineering shortcut is ÷ 10,000, which is accurate to within 2% for press selection.
Then apply a safety factor of 1.3 — never quote a press at the theoretical max. We use this on every RFQ. For complex shapes (louvers, deep draws) the perimeter estimate becomes the dangerous number, so we add a 0.2–0.5 mm radius rule and re-measure.
Worked example: 2.5 mm SPCC bracket
Cut perimeter: 480 mm. Thickness: 2.5 mm. SPCC shear strength: ~310 MPa.
Raw force = Perimeter × Thickness × Shear = 480 × 2.5 × 310 = 372,000 N = 372 kN.
Convert to tonnes of force: 372 kN ÷ 9.81 ≈ 38 tonnes-force. The common shortcut is ÷ 10 (gives 37 t), which is fine for first-pass sizing.
Apply the 1.3 safety factor: 38 × 1.3 ≈ 49 tonnes-force — a 63T press handles this with margin.
Where the math goes the other way: if the part is 6 mm thick or spans a 1,500 mm perimeter (large agricultural or HVAC panels), the same math lands at 250-320 T. Those jobs need the 250T or 500T press.
What happens when the tonnage is wrong
Too little force → part burrs, dies chip, the press stalls and trips the overload. You lose an afternoon on the floor, and possibly the tool.
Too much force → die components (especially punches under 3 mm) bend or shear. Tooling rebuild cost runs $1,000-$3,000 per cavity — and the lead time loss is worse than the money.
Right force with bad alignment → uneven shear, broken grain in deep-draw parts, springback surprises. This is the most expensive case because the part looks fine until your customer receives it.
When to skip the math and ask us
Stainless steel, high-strength steel (HSLA), or material thicker than 4 mm.
Deep draws deeper than 1.5× diameter, or step draws.
Parts with more than 2 mm of simultaneous trim + draw (compound dies).
Send your drawing and material spec. We will return the recommended press, the safety factor, and the tonnage we actually book for the job — usually within one business day.
Frequently asked questions
What if my calculation says 280T but my part is 1 mm thick?
Trust the formula for blanking. For drawing and bending the force profile is different — add 30-50% on top, and large-panel deep draws can require 300T+ presses regardless of base thickness. Send us the geometry; we will pressure-test the number.
Do you do FEA simulation?
For runs above 50,000 pcs or tight tolerance parts, we run a quick strip-layout simulation and the tonnage check together. For prototype and short runs, the formula + safety factor is enough.
Can I bring my own die?
Yes. Send it with material cert and last maintenance log. We will inspect on arrival and quote a press run within one business day.
Have a part in mind?
Send your drawing. We will pressure-test the tonnage, give you a quote, and ship T1 samples in 5-7 business days.
Upload Your Drawing